Loading...

Construction Parameters

30 sqm500 sqm

Construction cost estimate

Total cost
EUR
Total cost RON
RON
Price / usable sqm
EUR/mp
Built area
built sqm

Cost breakdown by element

FOUNDATION STRUCTURE INTERIOR FINISHES WALLS WINDOWS INSULATION ROOF truss HEATING ELECTRICAL PLUMBING FACADE UTILITIES PROJECT + PERMITS RISK RESERVE Cheap Medium Expensive
Labor included: Prices include both materials and labor of the construction team. Labor represents on average 35-45% of the total cost. The price varies if you work with a construction company (more expensive, but with warranty) or with independent craftsmen (cheaper, but higher risk).
Mortgage loan (20 years)
RON/month (installment)
Total cost with loan
EUR (20 yrs, 8.5%)
Loan interest
EUR (total interest)

Cost breakdown

Estimated TOTAL

Cost distribution

Cost per sqm — quality comparison

Construction planner

Phase timeline, inflation, savings and loan — plan month by month

40%
+ Comparison: build vs buy a home

Construction phases — timeline

Total duration
months
Cost with inflation
EUR
Own savings
EUR
Loan installment
RON/month
Material list by phase — what to buy and when

Structure type comparison — indicative price / usable sqm

Structure Economic Standard Premium Luxury Duration
BCA550-650€700-850€900-1.100€1.200-1.500€8-14 months
Brick600-700€750-900€950-1.150€1.250-1.600€10-16 months
Timber500-600€650-800€850-1.050€1.100-1.400€4-8 months
Steel frame550-650€700-850€900-1.100€1.200-1.500€3-6 months
Modular450-550€600-750€800-1.000€2-4 months

Indicative prices 2026, including labor and materials. Vary by region, season and project complexity.

Structure type comparison

AAC (autoclaved aerated concrete)

  • Excellent thermal insulation (no thick polystyrene needed)
  • Easy to work with — cuts with a saw
  • Most popular material in Romania (60%+ new builds)
  • ! Lower mechanical strength than brick

Brick

  • Superior mechanical strength, 100+ year durability
  • Good thermal inertia (house stays cool in summer)
  • Excellent moisture resistance
  • ! Requires external insulation (10-15 cm polystyrene)

Timber frame

  • Fast construction (4-8 months vs 12-16 for brick)
  • Eco-friendly, low carbon footprint
  • Very good thermal insulation (thin walls)
  • ! Requires moisture and insect treatment

Steel frame

  • Fastest construction (3-6 months)
  • Excellent seismic resistance
  • Design flexibility (large spans without columns)
  • ! Thermal bridges — requires careful insulation

Construction duration + inflation impact

Construction materials get more expensive each year. During construction, prices rise — the longer it takes, the more the initial budget is exceeded.

Estimated duration
months
Material inflation/year
~8%
average 2022-2026
Additional inflation cost
EUR estimat
Total cost with inflation
EUR
Tip: Lock in prices with the supplier at contract signing. Negotiate fixed-price clauses or a maximum increase cap. Purchase materials in stages (not all upfront, but not at the last minute).

Build vs buy — investment comparison

Is it better to build or buy a finished house? Compare total costs, including time and risks.

Criterion Build Buy new house Buy second-hand
Total build investment
land + house + inflation
Equivalent purchase (new)
new home market price
Build savings
vs buying new
Note: Purchase prices are estimated based on the Romanian real estate market average (2026). Building your own offers savings of 15-30% compared to buying, but involves time, effort and budget overrun risk.

Prices are indicative and vary by region, season, project complexity and material availability.

If you noticed an inaccuracy or error — please let us know and we will correct it immediately. Data is updated periodically according to Romanian market prices.

Tips for building a house

1

Real budget = estimate + 15-20% reserve. Unexpected costs always arise: geotechnical issues, design changes, material price increases. Allow a minimum 15% reserve.

2

Invest in the foundation and structure. Saving on the foundation or structure is a costly long-term mistake. A geotechnical study (300-800 RON) is mandatory — prevents settling and cracks.

3

Thermal insulation — savings for 30+ years. Good insulation (15-20 cm polystyrene + triple-glazed windows) reduces heating bills by 40-60%. The investment pays back in 5-7 years, then you save pure.

4

Compare at least 3 builder quotes. Prices vary 20-40% between builders for the same work. Ask for references, visit finished projects and read the contract carefully. Pay in installments based on physical stages.

5

Heat pump + solar panels = smart investment. The initial cost is higher (+5,000-12,000 EUR) but you save 50-70% on heating and hot water. There are also financing programs (Casa Verde, AFM) with subsidies up to 60%.

Quick simulation

Area

Market prices 2026

Average labor150-250 €/mp
BCA 30cm~12 €/mp zid
Porotherm brick~18 €/mp zid
Concrete C25/30~90 €/mc
Reinforcing steel~700 €/tona
Ceramic tile~15-25 €/mp
Triple-glazed PVC joinery~120-180 €/mp
15cm polystyrene~8-12 €/mp

Often forgotten costs

! House design + permit: €2,000-5,000
! Geotechnical study: €60-160
! Utility connections (water, gas, electricity): €1,500-4,000
! Yard landscaping + paths: €2,000-8,000
! Land registration + cadastre: €500-1,500
! Furniture + appliances: €5,000-20,000

Construction stages

1
Design + permit
2-6 months
2
Foundation + structure
2-5 months (30-35% budget)
3
Roof + joinery
1-2 months (15-20% budget)
4
Installations
1-2 months (15-20% budget)
5
Interior finishes
2-4 months (20-25% budget)
6
Exterior + landscaping
1-2 months (5-10% budget)

Are you a construction company or architect?

Your ad here for 3 EUR/month

Preview — this is how your ad will look

?
Recommended
Your Ad Title
Description will appear here...
🎰

Free Lottery — 1 Month of Advertising FREE!

Monthly draw. Participate for free, no obligations.

Do you sell construction materials?

Your ad here for 3 EUR/month

Preview — this is how your ad will look

?
Recommended
Your Ad Title
Description will appear here...
🎰

Free Lottery — 1 Month of Advertising FREE!

Monthly draw. Participate for free, no obligations.